The Valley Diaries. Vol. 3: October reflections from within The Valley

November 5, 2025
·
🕑 2 min

 

October passed quietly here.

Cool mornings, slower afternoons, and the kind of steady progress that doesn’t rush. The Valley Resort felt calm, and the work followed that same pace.

New walking paths are taking shape, gently connecting areas that, until recently, were only drawings and ideas. With each section finished, The Valley becomes easier to imagine as a place you can move through, stop for a moment, look around, and feel at ease.

Meanwhile, work continued below the surface

The water systems are being prepared, pumps soon to be installed, and the main reservoir already in place, ready to hold 114 cubic meters of water.

It’s quiet, essential work.

Not the kind that stands out yet, but the kind that will make everything else possible later. Warmth in winter. Cool air in summer. A reliable flow that keeps the space comfortable and alive.

October was about things starting to connect

Paths meeting landscape.
Structures finding their place beside trees and hills.
The natural and the built beginning to fit together.

As we move into November, The Valley Resort feels closer to itself: settled, steady, quietly full of life.

The Valley Diaries will continue…

We’ll keep sharing how this place grows, month by month, how a mountain becomes somewhere to return to, and how The Valley becomes a place that simply feels right.

 

Interested by the opportunity?

Complete the contact
form for more details.
You will receive our brochure via email, once you submit the form.







    Fields marked with are mandatory.